CSF Engineering has the ability and experience to undertake and manage the structural engineering component of the project. Our experience in fabrication and installation adds a significant amount of practicality and buildability into the design process. We have completed the design for many projects ranging from new mezzanine floors to a 126m long x 44m wide x 20m high dump truck maintenance workshop for OK Tedi Mine in PNG. The main benefits of using CSF Engineering are:

  1. Steel structures are designed to minimise fabrication and erection costs, saving money and construction time.
  2. Project can be fast tracked as design and steel detailing undertaken by the one contractor.
  3. Reduced engineering and steel detailing costs as the engineering model can be used to produce the steel detailing drawings, which significantly reduces the drafting times.